When the rain gets in

Horizontal and vertical waterproofing: why after about thirty years the rain gets into the building, how open joints must stay covered during the works – and who gives the instruction.

Length 3:34 min
Subtitles are burned into the picture.Watch on YouTube

Chapters

Transcript

When the rain gets in

Heavy rain – and inside it is dripping: down at the floor, up at the ceiling, and on the storey above, at the floor again. That is a barrier that is no longer a barrier.

What a barrier is

Every building needs barriers against water: horizontal, under the floor finish and up to the wall – the horizontal waterproofing; from there, turned up the wall – the vertical waterproofing, the upstand, at least twenty centimetres above the finished floor. The two must be sealed together. The weak point is the joint where they meet.

Two storeys, three points of entry

With open access walkways, the walkway above is the roof of the storey below. If the barriers are missing, the rain gets in three times: upstairs at the foot of the wall, downstairs at the ceiling – and downstairs at the foot of the wall again.

Thirty years

No waterproofing lasts for ever. After about thirty years the membrane is brittle, cracked and has come away from the wall, and the joints are open. Then every downpour finds its way into the building – until plaster and steel show it.

During the works

When the floor finish is removed for renewal, the joints lie open: at the ceiling, at the foot of the wall, at every column. Until the new waterproofing is laid, they must be covered – with the cover turned tightly up wall and column, falling to an open outlet and secured against wind. Otherwise every rainfall runs into both storeys. Even during a stoppage of the works, open joints must stay covered.

Who gives the instructions?

Who gives that instruction? The site direction. The architect, as director de obra, resolves anything unforeseen; the technical architect directs and checks the work on site. Both enter their instructions in the site diary, the libro de órdenes. The contractor carries out the works. It must protect its open site and is liable for damage it causes.

Who is liable?

Anyone altering the structure needs a site direction – and the client, the owners' association, must see to that. If there is no site direction, the administrator must arrange urgent protective measures at once. The association is liable to the owners – with recourse against the contractor.

Doing it right means: horizontal waterproofing laid to falls, upstand at wall and column at least twenty centimetres above the finished floor, every joint sealed, every outlet clear – all checked before the floor finish goes on top. Then the rain stays out. Know first, then build.

Frequently asked questions

What are horizontal and vertical waterproofing?

The horizontal waterproofing lies under the floor finish, up to the wall; the vertical waterproofing, the upstand, is turned up the wall at least twenty centimetres above the finished floor. The two must be sealed together; the weak point is the joint where they meet.

Why does the rain get in after a few decades?

No waterproofing lasts for ever. After about thirty years the membrane is brittle, cracked and has come away from the wall, and the joints are open. Then every downpour finds its way into the building.

What must happen to open joints during the works?

Until the new waterproofing is laid, they must be covered – with the cover turned tightly up wall and column, falling to an open outlet and secured against wind. Even during a stoppage of the works.

Who orders the protective measures?

The site direction: the architect, as director de obra, resolves anything unforeseen; the technical architect directs and checks the work on site. Both enter their instructions in the site diary, the libro de órdenes. The contractor carries out the works and must protect its open site.

Who is liable to the owners?

The owners' association, with recourse against the contractor. If there is no site direction, the administrator must arrange urgent protective measures at once.

Sources and standards

Notice: The videos and documents on this page are general technical information on the state of the art. They do not refer to any particular building, construction project or owners’ association; the examples are typified. They replace neither an inspection on site nor the assessment by the competent licensed technicians (dirección facultativa) and do not constitute legal advice. The official standards and legal texts in their current version prevail. Tierra & Madera does not provide services reserved in Spain to licensed technicians.
Made with AI assistance (including the voice and the translation). Content checked by Tierra y Madera, which is responsible for it. © 2026 Frank Thomaschewski / Tierra & Madera · Drawings, diagrams and texts are original works · Fonts under SIL Open Font License · All rights reserved; sharing by link expressly permitted. As of October 2026.