Repair or renovation?

Does everything have to wait until the big renovation has been designed? No. But not everything may simply go ahead. The law does not ask “repair or renovation?” – it asks four questions.

First question: the structure

First: is the structure being altered – foundations, columns, beams, floor slabs? Then it needs a design by a qualified designer and a site direction team: the architect as director de obra and the technical architect. Before that, the diagnosis; after the design, the invitation to tender. That takes months – and rightly so.

Second question: asbestos

Second: is asbestos involved, for example in old roofing sheets? Before any work, it must be established whether it is asbestos – if there is any suspicion, a qualified professional examines the material. If it is, only a registered specialist firm may do the work, with a work plan approved by the labour authority. The approval alone can take up to forty-five days – even for a repair.

Third and fourth questions

Third: are several companies or self-employed workers on site? Then the client appoints a health and safety coordinator – on every site, even without a design. Fourth: the town hall. Almost all work on an existing building is notified to the town hall: the comunicación previa, fifteen days before work starts. A design is only part of it when the structure is affected.

What that means

What does that mean for a building with many jobs to do? Pipes in the basement, waterproofing, railings, outlets: no structure, no asbestos – so, repairs. A technical specification, bids, the notification to the town hall – and work can start. Columns and asbestos roofs, on the other hand: know first, then design, then build. Both run side by side – one health and safety coordinator for all firms.

And in an emergency?

And if it drips or crumbles? Cover, prop up, cordon off – the administrator arranges that at once, and a professional says where and how. The emergency does not replace planning. It buys time.

Three tracks: protect at once, repair promptly, renovate thoroughly. Keep them apart and you make progress – with no shortcuts around the law. Know first, then build.

Frequently asked questions

Does everything have to wait until the big renovation has been designed?

No – but four questions decide what may start now.

When does a job need a design and a site direction team?

When the structure is altered: foundations, columns, beams, floor slabs.

What if asbestos is suspected?

Before any work, it must be established whether it is asbestos – if there is any suspicion, a qualified professional examines the material. If it is, only a registered specialist firm with an approved work plan may do the work.

Does a repair also have to be notified to the town hall?

Almost all work on an existing building: comunicación previa, fifteen days before.

Who acts in an emergency?

Cover, prop up, cordon off – the administrator arranges it at once; a professional says where and how.

Sources and standards

Notice: The videos and documents on this page are general technical information on the state of the art. They do not refer to any particular building, construction project or owners’ association; the examples are typified. They replace neither an inspection on site nor the assessment by the competent licensed technicians (dirección facultativa) and do not constitute legal advice. The official standards and legal texts in their current version prevail. Tierra & Madera does not provide services reserved in Spain to licensed technicians.
Made with AI assistance (including the voice and the translation). Content checked by Tierra y Madera, which is responsible for it. © 2026 Frank Thomaschewski / Tierra & Madera · Drawings, diagrams and texts are original works · Fonts under SIL Open Font License · All rights reserved; sharing by link expressly permitted. As of October 2026.